We are exclusive direct seller mandates representing steel factory, we are in position of supplying gbfs (granulated blast furnace slag) for year 2007, further information will be provided upon enquiry.
Lead time: 30 days for shipment after L/ C received
Loading rate: 10, 000 metric per day
Payment: by irrevocable L/ C at sight
Copyright Disclaimer:
Contents of
"Granulated Blast Furnace Slag" are from the Internet, the copyright belongs to the
original page. Check the original page for copyright statement.